Ebulen Consult
  • Home
  • Project
  • About Us
  • Contact Us
  • More
    • Home
    • Project
    • About Us
    • Contact Us
Ebulen Consult
  • Home
  • Project
  • About Us
  • Contact Us

Highlighted Projects

1.55 MW – Chadstone Shopping Centre, Carpark-A Extension Roof

1.55 MW – Chadstone Shopping Centre, Carpark-A Extension Roof

1.55 MW – Chadstone Shopping Centre, Carpark-A Extension Roof

Address: 1341 Dandenong Rd, Malvern East VIC 3145 

Date: July 2021


  • Review and engineering advice on the Carpark A extension roof structural design to incorporate solar PV system installation.
  • Design and assessments for solar PV racking frames.
  • Bespoken racking solution due to multi-directions roof pitch and structural arrangements.
  • Provided fu

Address: 1341 Dandenong Rd, Malvern East VIC 3145 

Date: July 2021


  • Review and engineering advice on the Carpark A extension roof structural design to incorporate solar PV system installation.
  • Design and assessments for solar PV racking frames.
  • Bespoken racking solution due to multi-directions roof pitch and structural arrangements.
  • Provided full scope engineering analysis, computations and reports.
  • Full engineering certifications and documentations.
  • Addressed RFIs from the EPC and builder.
  • Construction supports and design for miscellaneous installation items, such as pallet loading on the roof.

2.3 MW – Adelaide Airport, SA 5950

1.55 MW – Chadstone Shopping Centre, Carpark-A Extension Roof

1.55 MW – Chadstone Shopping Centre, Carpark-A Extension Roof

Address: Sir Richard Williams Ave, Adelaide Airport SA 5950 

Date: August 2024


  • Terminal buildings structural assessments.
  • Design and assessments for solar PV racking frames.
  • Professional guidance and procedures for mechanical testing on site.
  • Provided full scope engineering analysis, computations and reports.
  • Full engineering certifications and

Address: Sir Richard Williams Ave, Adelaide Airport SA 5950 

Date: August 2024


  • Terminal buildings structural assessments.
  • Design and assessments for solar PV racking frames.
  • Professional guidance and procedures for mechanical testing on site.
  • Provided full scope engineering analysis, computations and reports.
  • Full engineering certifications and documentations.
  • Addressed RFIs from owner’s engineer – WGA with solid evidence of design compliance for independent certification. 
  • Construction supports and design for miscellaneous installation items, such as inverter frames and cable trays.

Bunnings Warehouse Stores Solar PV Installation Rollout

1.55 MW – Chadstone Shopping Centre, Carpark-A Extension Roof

Bunnings Warehouse Stores Solar PV Installation Rollout

Address: 30+ sites in VIC, NSW, QLD and WA 

Date: 2024 - 2025 


  • Site visits for visual structural inspections and information collection.
  • Assessed warehouse portal frames, beams, columns and secondary structures.
  • Design and assessments for solar PV racking frames.
  • Provided full scope engineering analysis, computations and reports.
  • Full engineeri

Address: 30+ sites in VIC, NSW, QLD and WA 

Date: 2024 - 2025 


  • Site visits for visual structural inspections and information collection.
  • Assessed warehouse portal frames, beams, columns and secondary structures.
  • Design and assessments for solar PV racking frames.
  • Provided full scope engineering analysis, computations and reports.
  • Full engineering certifications and documentations.
  • Completion conformance inspections by physical site visits and remote photo reviews.
  • Construction supports and design for miscellaneous installation items, such as inverter frames and cable trays.

90 MWp Wunghnu Solar Farm

425 MWp Wellington North Solar Farm

Bunnings Warehouse Stores Solar PV Installation Rollout

Address: Wunghnu, VIC 3635

Date: May 2023 

  

  • Evaluate and validate the structural design of the PVH AxoneDUO Tracker system for the Wunghnu Solar Farm against applicable Codes and Standards.
  • Review the reference documents provided by PVH, including the structural design report, wind tunnel test reports, and other relevant documentation.
  • Exami

Address: Wunghnu, VIC 3635

Date: May 2023 

  

  • Evaluate and validate the structural design of the PVH AxoneDUO Tracker system for the Wunghnu Solar Farm against applicable Codes and Standards.
  • Review the reference documents provided by PVH, including the structural design report, wind tunnel test reports, and other relevant documentation.
  • Examine the solar tracker system design report, wind tunnel test reports, and other design-related documents provided by PVH.
  • Review the structural member schedule, including the specifications for actuator posts, standard posts, torque tubes, and module support for different rows of the tracker system.
  • Ensuring that the selected steel grades and protection coatings meet durability requirements for the intended 40-year service life.
  • Evaluate the design's compliance with the National Construction Code (NCC 2022) and assess structural performance requirements, resistance, and reliability.
  • Prepare a comprehensive report summarizing findings, validations, and recommendations based on the engineering review and analysis.
  • Provide a clear and concise conclusion confirming the compliance of the PVH AxoneDUO Tracker system with the relevant Australian Codes and Standards.

425 MWp Wellington North Solar Farm

425 MWp Wellington North Solar Farm

425 MWp Wellington North Solar Farm

Address: Wellington North, NSW 2820

Date: June 2023


  • Ensuring adherence to relevant standards, codes, and reference documents in the design and assessment processes.
  • Gathering and managing comprehensive site information to inform the design and assessment.
  • Executing design actions considering ultimate and serviceability limit state actions.
  • Exa

Address: Wellington North, NSW 2820

Date: June 2023


  • Ensuring adherence to relevant standards, codes, and reference documents in the design and assessment processes.
  • Gathering and managing comprehensive site information to inform the design and assessment.
  • Executing design actions considering ultimate and serviceability limit state actions.
  • Examine the PVH AxoneDuo solar tracker system design report, wind tunnel test reports, and other design-related documents provided by PVH.
  • Review the structural member schedule, including the specifications for actuator posts, standard posts, torque tubes, and module support for different rows of the tracker system.
  • Performing static and dynamic analyses to assess stability and response under various conditions.
  • Conducting structural checks to verify compliance with standards.
  • Define and implement methods for the review and validation of design elements and ensure compliance with the National Construction Code (NCC).
  • Providing formal report and certificate to client. 

Project Gallery


    Ebulen Consult pty ltd

    Waterman Office, Level 3, Eastland SC, 175 Maroondah Highway, Ringwood, VIC 3134 AU

    +61 3 9259 3400 info@ebulenconsult.com.au

    Copyright © 2025 Ebulen Consult pty ltd - All Rights Reserved.

    Powered by